Conservation & Heritage Issue 52 Summer/Autumn 2026 - Flipbook - Page 90
The dome itself is a technical as well as artistic achievement,
constructed from Dennett’s innovative ‘fireproof concrete’
and finished in a complex stratigraphy of plaster, oil paint,
and varnish. Beneath its current appearance lies a meticulous
layering: lead-white grounds, ochre-tinted creams, and vividly
pigmented surface paints, including mixtures of Prussian
blue, chrome yellow, and vermilion. Each element reflects
both the material culture and the technological advances of
the mid-19th century.
Time, however, has not been entirely kind to this elaborate
scheme. Between October 2021 and March 2022, Chroma
Conservation Ltd. undertook a significant conservation
campaign, addressing decades of accumulation of dirt,
discoloured varnishes, and earlier, less sensitive restorations.
The process revealed the fragility of the original paint
layers—particularly in areas where previous over-cleaning had
eroded the details—and required a careful balance between
removal and retention of the overpainting and later sensitive
retouching.
The conservation strategy was guided by a principle familiar
to heritage practice: to preserve as much original fabric
as possible while restoring visual coherence. Disfiguring
overpaint was selectively reduced, cracks were stabilised, and
Above, before treatment.
Above, before treatment.
I
Conservation & Heritage Journal
88
I