Conservation & Heritage Issue 52 Summer/Autumn 2026 - Flipbook - Page 95
Microlift dumbwaiter, plus visitor shop and event venue,
as well as improving accessibility and enhancing visitor
experiences.
lifting power. This advanced drive technology ensures
smoother operation, reduced power consumption and lower
long-term running costs.
Accessibility has been central to the design, with new
circulation routes and inclusive features ensuring that every
visitor feels welcome and represented.
As a result, the Microlift now facilitates reliable and
controlled movement of goods between floors while offering
a quieter, more efficient and energy-efficient solution for the
client’s daily operations.
Preston City Council has led the project in collaboration
with Conlon Construction Ltd, who oversaw the major
structural works, and HUB Build, responsible for the interior
fit-out. Buttress Architects served as lead architects for the
restoration, while Ralph Appelbaum Associates developed
the overall design strategy and visitor experience.
Timothy Joel, Assistant Director, Head of Culture for Preston
City Council, shares:
“
Direct Access provided accessibility consultancy to ensure
inclusive design across all spaces, with Ridge and Partners LLP
and Focus Consultants supporting the project’s delivery and
quality assurance. Stannah Lifts managed the installation
and provides ongoing maintenance of the dumbwaiter.
The installation of the new floor-loading Microlift
dumbwaiter from Stannah Lifts has greatly improved
café operations and ensures safer handling of bulky
items. It’s safer for our staff, streamlines workflows, and
allows us to focus on further improving operational
efficiency.”
With the redevelopment complete and operational logistics
improved, The Harris is now better equipped to manage
high visitor numbers and support its growing programme of
exhibitions and events. As a result, the refurbished building
is expected to attract an additional 100,000 visitors each
year, building on its existing annual footfall of 350,000.
For more information, visit: www.stannahlifts.co.uk
The solution
Stannah Lifts recommended a floor-level loading Microlift
as the most effective solution for The Harris Café. Unlike
traditional dumbwaiters that load at waist height, the floorlevel Microlift allows items to be transferred directly on and
off the lift using small trolleys, roll cages or pallets. The floor
loading design significantly reduces the need for strenuous
lifting and drastically lowers the risk of back injuries and
other manual handling-related accidents. Its impact is being
appreciated by staff.
The Microlift dumbwaiter features a galvanised steel
supporting frame that can be erected quickly with minimal
on-site building work and does not require a load-bearing
shaft. With a 100 kg capacity, the Microlift 100B model
provides fast and reliable transport of goods between floors,
offering a cost-effective way to mitigate manual handling
risks while improving operational efficiency.
To complement the surrounding environment, the Microlift
car and landing entrances are finished in a durable grey
baked-enamel coating, delivering both functionality and a
clean professional appearance.
The results
The installation of the Stannah Microlift has delivered
significant improvements in providing safe loading,
transporting goods to the first and second floors of galleries
and exhibitions.
By providing a dedicated internal route for transporting
heavy and fragile items between floors, the dumbwaiter has
made it easier for staff to manoeuvre goods, reducing manual
handling risks and improving safety.
Fitted with a modern VVVF (Variable Voltage Variable
Frequency) drive system, the Microlift delivers improved
energy efficiency without compromising performance or
I
Conservation & Heritage Journal
93
I